Tantri, Diah Dwi (2021) Analisis anggaran dan realisasi proyek sebagai alat pengendalian biaya atas proyek pembangunan ATM drive thru Cimb Niaga Bintaro PT Sentra Desain Kreasindo. Undergraduate thesis, Universitas Islam Negeri Maulana Malik Ibrahim.
|
Text (Fulltext)
17520068.pdf - Accepted Version Available under License Creative Commons Attribution Non-commercial No Derivatives. Download (5MB) | Preview |
Abstract
INDONESIA:
Layanan infrastruktur untuk akses financial perlu dikembangkan untuk menunjang perkembangan perbankan di Indonesia. PT Sentra Desain Kreasindo membantu pembangunan ATM drive thru CIMB Niaga Bintaro sebagai penunjang akses financial. Penelitian ini dilakukan dengan tujuan untuk mengetahui apakah hasil penghitungan anggaran biaya atas proyek pembangunan dapat digunakan sebagai alat pengendalian. Dari latar belakang tersebut penelitian ini dilakukan dengan judul “Analisis Anggaran Dan Realisasi Proyek Sebagai Alat Pengendalian Biaya Atas Proyek Pembangunan ATM Drive Thru CIMB Niaga Bintaro PT Sentra Desain Kreasindo”.
Peneliti menggunakan pendekatan kualitatif deskriptif yang bertujuan untuk menggambarkan fokus penelitian yang meliputi anggaran dan realisasi biaya proyek. Analisis data yang digunakan untuk mengolah data sehingga lebih mudah untuk memahami informasi yang didapat yaitu dengan melakukan interview, analisa dokumentasi, dan triangulasi untuk menguji kredibilitas data yang diperoleh.
Hasil penelitian menunjukkan bahwa pengendalian biaya yang dilakukan oleh PT Sentra Desain Kreasindo belum menginterpretasikan dengan cukup baik anggaran yang disusun. Hal tersebut dapat dilihat melalui total realisasi biaya yang lebih besar dibandingkan dengan total anggaran yang disusun menyebabkan adanya selisih yang tidak menguntungkan (unfavorable) pada biaya bahan baku. Selisih terjadi karena beberapa biaya bahan baku dari pekerjaan tambahan yang sebelumnya tidak ada dalam anggaran muncul dalam laporan realisasi. Sehingga, dari beberapa biaya yang muncul akibat tambahan pekerjaan akan dibuatkan budget tambahan oleh manager proyek untuk diajukan sebagai addendum (kerja tambah) dalam perhitungan akhir project. Sedangkan untuk biaya tenaga kerja langsung dan biaya overhead menunjukkan hasil tidak ada selisih yang berarti pengendalian biaya untuk kedua biaya tersebut telah dinterpretasikan secara tepat.
ENGLISH:
Infrastructure services for financial access need to be developed in order to support banking development in Indonesia. PT Sentra Desain Kreasindo helped the construction of ATM drive-thru CIMB Niaga Bintaro as financial access support. This study was conducted to find out if the results of calculating the cost budget for development projects can be used as a control tool. From this background, this research was conducted with the title "Budget Analysis and Project Realization as a Cost Control Tool for THE CIMB Niaga Bintaro Drive Thru ATM Development Project PT Sentra Desain Kreasindo".
This study use a descriptive qualitative approach that aims to illustrate the focus of research covering the budget and realization of project costs. Data analysis used to process data so that it is easier to understand the information obtained by conducting interviews, documentation analysis, and triangulation to test the credibility of the data obtained.
The results showed that the cost control conducted by PT Sentra Desain Kreasindo has not interpreted quite well the budget that was prepared. This can be seen through the total realization of costs greater than the total budget compiled causing an unfavorable difference in the cost of raw materials. The difference occurred because some of the raw material costs from additional work that were not previously in the budget appeared in the realization report. Thus, from some costs arising from additional work will be made an additional budget by the project manager to be submitted as an addendum (add-on work) in the final calculation of the project. As for direct labor costs and overhead costs show no difference which means cost control for both costs has been interpreted appropriately.
ARABIC:
ﲢﺘﺎج ﺧﺪﻣﺎت اﻟﺒﻨﻴﺔ اﻟﺘﺤﺘﻴﺔ ﻟﻠﻮﺻﻮل اﳌﺎﱄ إﱃ اﻟﺘﻄﻮﻳﺮ ﻟﺪﻋﻢ ﺗﻘﺪم اﳌﺼﺮﰲ ﰲ إنﺪونﻴﺴﻴﺎ. ﺳﺎﻋﺪت ﺷﺮﻛﺔ ﺳﻴﻨﱰا دﻳﺴﲔ ﻛﺮﻳﺴﻴﻨﺪوا ﰲ ﺑﻨﺎء ﳏﺮك ﻋﱪ أﺟﻬﺰة اﻟﺼﺮاف اﻵﱄ ﺟﻴﻤﺐ نﻴﺎﻏﺎ ﻟﺪﻋﻢ اﻟﻮﺻﻮل اﳌﺎﱄ. ﻛﺎن اﳍﺪف ﻣﻦ ﻫﺬا ﳌﻌﺮﻓﺔ ﻫﻞ ﳝﻜﻦ اﺳﺘﺨﺪام نﺘﺎﺋﺞ ﺣﺴﺎب اﳌﻴﺰانﻴﺔ ﳌﺸﺮوع ﺗﻨﻤﻮي ﻛﺄداة اﻟﺮﻗﺎﺑﺔ. ﻣﻦ ﻫﺬﻩ اﳋﻠﻔﻴﺔ، ﰎ إﺟﺮاء ﻫﺬا اﻟﺒﺤﺚ ﲢﺖ اﻟﻌﻨﻮان "ﲢﻠﻴﻞ اﳌﻴﺰانﻴﺔ وﲢﻘﻴﻖ اﳌﺸﺮوع ﻛﺄداة ﻛﺄداة ﳌﺮاﻗﺒﺔ اﻟﺘﻜﺎﻟﻴﻒ ﻋﻦ ﻣﺸﺮوع ﺑﻨﺎء ﳏﺮك ﻋﱪ أﺟﻬﺰة اﻟﺼﺮاف اﻵﱄ ﺟﻴﻤﺐ نﻴﺎﻏﺎ Niaga) (CIMB ﺑﻨﺘﺎروا ﺷﺮﻛﺔ ﺳﻴﻨﱰا دﻳﺴﲔ
ﻛﺮﻳﺴﻴﻨﺪوا ."
اﺳﺘﺨﺪﻣﺖ اﻟﺒﺎﺣﺜﺔ ﻣﻨﻬﺞ اﻟﻨﻮﻋﻲ اﻟﻮﺻﻔﻲ ﻳﻬﺪف إﱃ وﺻﻒ ﳏﻮر اﻟﺒﺤﺚ اﻟﺬي ﻳﺘﻀﻤﻦ اﳌﻴﺰانﻴﺔ وﲢﻘﻴﻖ ﺗﻜﺎﻟﻴﻒ اﳌﺸﺮوع.
ﲢﻠﻴﻞ اﻟﺒﻴﺎ»ت اﳌﺴﺘﺨﺪم ﳌﻌﺎﳉﺔ اﻟﺒﻴﺎ»ت ﲝﻴﺚ ﻳﺴﻬﻞ ﻓﻬﻢ اﳌﻌﻠﻮﻣﺎت اﶈﺼﻮﻟﺔ ﻳﻌﲏ ﺑﺘﺄدﻳﺔ اﳌﻘﺎﺑﻼت وﲢﻠﻴﻞ اﻟﻮfiﺋﻖ واﻟﺘﺜﻠﻴﺚ ﻻﺧﺘﺒﺎر
ﻣﺼﺪاﻗﻴﺔ اﻟﺒﻴﺎ»ت اﶈﺼﻮﻟﺔ.
أﻇﻬﺮت اﻟﻨﺘﺎﺋﺞ أن ﻣﺮاﻗﺒﺔ اﻟﺘﻜﺎﻟﻴﻒ اﻟﱵ ﻗﺎﻣﺖ øﺎ ﺷﺮﻛﺔ ﺳﻴﻨﱰا دﻳﺴﲔ ﻛﺮﻳﺴﻴﻨﺪوا ﱂ ﻳﻔﺴﺮ اﳌﻴﺰانﻴﺔ اﳌﺮﺗﺒﺔ ﺟﻴ ًﺪا ﲤﺎﻣﺎ. ﳝﻜﻦ
ﻣﻼﺣﻈﺔ ذﻟﻚ ﻣﻦ ﺧﻼل إﲨﺎل ﲢﻘﻴﻖ اﻟﺘﻜﺎﻟﻴﻒ اﻟﱵ ﺗﻜﻮن أﻛﱪ ﻣﻦ إﲨﺎل اﳌﻴﺰانﻴﺔ اﳌﺮﺗﺒﺔ ﳑﺎ ﻳﺘﺴﺒﺐ ﰲ اﻻﺧﺘﻼف ﻏﲑ اﻟﺮﲝﺒﻴﺔ ﰲ ﺗﻜﺎﻟﻴﻒ اﳌﻮاد اﳋﺎم. ﳛﺪث اﻻﺧﺘﻼف ﻷن ﺑﻌﺾ ﺗﻜﺎﻟﻴﻒ اﳌﻮاد اﳋﺎم ﻣﻦ اﻟﻌﻤﻞ اﻹﺿﺎﰲ اﻟﱵ ﱂ ﺗﻜﻦ ﻣﻮﺟﻮدة ﻣﻦ ﻗﺒﻞ ﰲ اﳌﻴﺰانﻴﺔ ﺗﻈﻬﺮ ﰲ ﺗﻘﺮﻳﺮ اﻟﺘﺤﻘﻴﻖ. ﻟﺬﻟﻚ، ﻣﻦ ﺑﻌﺾ اﻟﺘﻜﺎﻟﻴﻒ اﻟﱵ ﺗﻨﺸﺄ ﺑﺴﺒﺐ اﻟﻌﻤﻞ اﻹﺿﺎﰲ، ﺳﻴﺘﻢ وﺿﻊ اﳌﻴﺰانﻴﺔ اﻹﺿﺎﻓﻴﺔ ﻣﻦ ﻗﺒﻞ ﻣﺪﻳﺮ اﳌﺸﺮوع ﻟﺘﻘﺪﳝﻬﺎ ﻛﻤﻠﺤﻖ )ﻋﻤﻞ إﺿﺎﰲ( ﰲ اﳊﺴﺎب اﻟﻨﻬﺎﺋﻲ ﻟﻠﻤﺸﺮوع. وﰲ اﻟﻮﻗﺖ نﻔﺴﻪ، ﺗﻈﻬﺮ ﺗﻜﺎﻟﻴﻒ اﻟﻌﻤﺎﻟﺔ اﳌﺒﺎﺷﺮة واﻟﺘﻜﺎﻟﻴﻒ اﻟﻌﺎﻣﺔ أنﻪ
ﻻ ﻳﻮﺟﺪ اﻟﻔﺮق، ﳑﺎ ﻳﻌﲏ أنﻪ ﰎ ﺗﻔﺴﲑ ﻣﺮاﻗﺒﺔ اﻟﺘﻜﺎﻟﻴﻒ ﻋﻠﻰ ﺗﻜﻠﻔﺘﲔ ﺑﺸﻜﻞ ﺻﺤﻴﺢ.
Item Type: | Thesis (Undergraduate) | ||||||
---|---|---|---|---|---|---|---|
Supervisor: | Meldona, Meldona | ||||||
Contributors: |
|
||||||
Keywords: | Anggaran; Realisasi; Pengendalian Biaya; Budget; Realization; Cost Control; اﳌﻴﺰانﻴﺔ; اﻟﺘﺤﻘﻴﻖ; ﻣﺮاﻗﺒﺔ اﻟﺘﻜﺎﻟﻴﻒ | ||||||
Subjects: | 15 COMMERCE, MANAGEMENT, TOURISM AND SERVICES > 1501 Accounting, Auditing and Accountability > 150105 Management Accounting 15 COMMERCE, MANAGEMENT, TOURISM AND SERVICES > 1501 Accounting, Auditing and Accountability > 150109 Budgetary Accounting |
||||||
Departement: | Fakultas Ekonomi > Jurusan Akuntansi | ||||||
Depositing User: | Diah Dwi Tantri | ||||||
Date Deposited: | 02 Aug 2021 16:04 | ||||||
Last Modified: | 02 Aug 2021 16:04 | ||||||
URI: | http://etheses.uin-malang.ac.id/id/eprint/29648 |
Downloads
Downloads per month over past year
Actions (login required)
View Item |