Analisis anggaran biaya proyek preservasi Jalan Jolosutro - Kedungsalam - Balekambang - Sendangbiru sebagai alat pengendalian biaya pada PT Gunung Mujur Indonesia

Afifah, Nur (2020) Analisis anggaran biaya proyek preservasi Jalan Jolosutro - Kedungsalam - Balekambang - Sendangbiru sebagai alat pengendalian biaya pada PT Gunung Mujur Indonesia. Undergraduate thesis, Universitas Islam Negeri Maulana Malik Ibrahim.

[img]
Preview
Text (Fulltext)
15520069.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (2MB) | Preview

Abstract

INDONESIA:

Perkembangan di bidang pariwisata di Indonesia harus ditunjang dengan pembangunan insfrastruktur, sehingga dapat memacu sektor yang dapat di andalkan dalam meningkatkan pendapatan daerah. PT Gunung Mujur Indonesia melaksanakan proyek preservasi Jalan pada Jalur Lintas Selatan yang menjadi icon Kabupaten Malang. Penelitian ini bertujuan untuk mengetahui dan menganalisa anggaran biaya proyek preservasi Jalan Jolosutro-Kedungsalam-Balekambang-Sendangbiru sebagai alat pengendalian biaya.

Penelitian ini menggunakan metode kualitatif dengan pendekatan studi kasus. Obyek dalam penelitian ini adalah PT Gunung Mujur Indonesia. Analisis data yang yang digunakan yaitu dengan cara observasi, wawancara dan dokumentasi. Metode analisis data yang digunakan adalah analisis varians yang membandingkan antara anggaran dan realisasi biaya bahan baku langsung, biaya tenaga kerja langsung dan biaya overhead.

Hasil penelitian menunjukkan bahwa terjadi selisih menguntungkan antara anggaran dan realisasibiaya bahan baku, biaya tenaga kerja langsung, dan biaya overhead. Namun meski menguntungkan, pada biaya tertentu masih terdapat unfavorable yaitupada selisih kuantitas anggaran biaya bahan baku dan selisih efisiensi upah biaya tenaga kerja langsung.Cara mengantisipasinyadengan mencari suplier bahan baku dengan harga yang dibeli dibawah harga bahan baku yang dianggarkan dan dengan membuat kesepakatan dengan tenaga kerja dan tenaga buruh bahwa proyek harus bisa terselesaikan sebelum jangka waktu yang telah ditentukan. Dengan demikian maka tidak diperlukan tambahan jam kerja, hal ini akan menyebabkan selisih menguntungkan pada selisih kuantitas anggaran biaya bahan baku dan selisih efisiensi upah tenaga kerja dan tenaga buruh.

ENGLISH:

Developments in tourism in Indonesia must be supported by infrastructure development, so that it can spur reliable sectors in increasing regional income. PT Gunung Mujur Indonesia is implementing a Road preservation project on the Southern Cross Line which has become an icon of Malang Regency. This study aims to determine and analyze the budget of the Jolosutro-Kedungsalam-Balekambang-Sendangbiru Road preservation project as a cost control tool.

This research uses a qualitative method with a case study approach. The object of this research is PT Gunung Mujur Indonesia. Analysis of the data used is by observation, interview and documentation. The data analysis method used is the analysis of variance comparing the budget and the realization of direct raw material costs, direct labor costs and overhead costs.

The results showed that there was a beneficial difference between the budget and the realization of raw material costs, direct labor costs, and overhead costs. But even though it is profitable, at certain costs there is still unfavorable namely the difference in the budgetary quantity of raw material costs and the difference in efficiency of direct labor costs. How to anticipate it by finding suppliers of raw materials at prices purchased below the budgeted raw material prices and by making agreements with labor and labor that the project must be completed before the specified time period. Thus, additional work hours are not needed, this will lead to a beneficial difference in the difference in the budgetary quantity of raw material costs and the difference in efficiency of labor and labor wages.

ARABIC:

يجب دعم التطورات في مجال السياحة في إندونيسيا من خلال تطوير البنية التحتية ، بحيث يمكنها تحفيز قطاعات موثوقة في زيادة الدخل الإقليمي. تقوم شاركة غونونج موجور إندونيسيا بتنفيذ مشروع الحفاظ على الطريق على الخط الجنوبي للصليب الذي أصبح رمزًا لمالانغ ريجنسي. تهدف هذه الدراسة إلى تحديد وتحليل ميزانية مشروع الحفاظ على طريق يولو سوترا -كدونج سلام - بالي كنبانج - كأداة للتحكم في التكلفة

يستخدم هذا البحث طريقة نوعية مع نهج دراسة الحالة. هدف هذا البحث هو شاركة غونونج موجور . تحليل البيانات المستخدمة عن طريق الملاحظة والمقابلة والتوثيق. طريقة تحليل البيانات المستخدمة هي تحليل التباين الذي يقارن بين الميزانية وتحقيق تكاليف المواد الخام المباشرة وتكاليف العمالة المباشرة والتكاليف العامة

أظهرت النتائج وجود فرق مفيد بين الميزانية وتحقيق تكاليف المواد الخام وتكاليف العمالة المباشرة والتكاليف العامة. ولكن على الرغم من أنها مربحة ، لا يزال هناك اختلاف غير مواتٍ في كمية الميزانية من تكاليف المواد الخام والفرق في كفاءة تكاليف أجور العمالة المباشرة في بعض التكاليف. القوى العاملة التي يجب أن يكتمل المشروع قبل الفترة الزمنية المحددة. لذلك ، ليست هناك حاجة لساعات عمل إضافية ، وهذا سوف يسبب اختلافًا مفيدًا في الفرق في كمية الميزانية من تكاليف المواد الخام والفرق في كفاءة العمالة وأجور العمالة.

Item Type: Thesis (Undergraduate)
Supervisor: Meldona, Meldona
Contributors:
ContributionNameEmail
UNSPECIFIEDMeldona, MeldonaUNSPECIFIED
Keywords: Anggaran; Pengendalian; Realisasi; Varian; Budget; Control; Realization; Variant; الميزانية; التحكم; الإدراك; البديل
Departement: Fakultas Ekonomi > Jurusan Akuntansi
Depositing User: Nur Afifah
Date Deposited: 09 Jul 2020 15:49
Last Modified: 09 Jul 2020 15:49
URI: http://etheses.uin-malang.ac.id/id/eprint/18055

Downloads

Downloads per month over past year

Actions (login required)

View Item View Item