Wulandari, Leni Tri (2016) Pengelolaan modal kerja krupuk ikan pada usaha mikro kecil dan menengah (UMKM) Kampung Krupuk Desa Kedung Rejo Kecamatan Jabon Kabupaten Sidoarjo. Undergraduate thesis, Universitas Islam Negeri Maulana Malik Ibrahim.
|
Text (Fulltext)
12510177.pdf - Accepted Version Available under License Creative Commons Attribution Non-commercial No Derivatives. Download (1MB) | Preview |
Abstract
INDONESIA:
Kampung Krupuk merupakan salah satu Usaha Mikro Kecil dan Menengah (UMKM) sekaligus sebagai ikon wisata Kabupaten Sidoarjo. Jenis krupuk ikan yang diproduksi di kampung krupuk merupakan produk unggulan yang dimilikinya. Dengan jumlah pengrajin 7 pengrajin di Dusun Tungguwulung dan 5 pengrajin di Dusun Bioro Desa Kedung Rejo Kecamatan Jabon Kabupaten Sidoarjo. Tujuan dari penelitian ini untuk mengetahui dan menjelaskan jangka waktu periode terikatnya modal kerja, proyeksi perhitungan kebutuhan kas rata-rata per hari, dan perputaran modal kerja.
Jenis penelitian dalam penelitian ini adalah kualitatif diskriptif. Obyek dalam penelitian ini adalah Usaha Mikro Kecil dan Menengah (UMKM) Kampung Krupuk Desa Kedung Rejo Kecamatan Jabon Kabupaten Sidoarjo sedangkan subyek penelitiannya adalah para pengrajin krupuk ikan di Kampung Krupuk. Penelitian ini merupakan data yang diambil dari lapangan dengan pendekatan survey, data yang dikumpulkan berupa kata-kata dan dokumentasi. Metode yang digunakan dalam metode ini adalah observasi, wawancara, dan studi pustaka.
Hasil penelitian menunjukkan bahwa (1) Jangka waktu periode terikatnya modal kerja yang dibutuhkan pada UMKM krupuk ikan Kampung Krupuk Desa Kedung Rejo kerja adalah 12 hari. (2) Kebutuhan kas rata-rata per produksi pengrajin krupuk ikan UMKM Kampung krupuk Desa Kedung Rejo untuk keperluan produksi krupuk ikan sebanyak 1 kwintal sebesar Rp.2.487.860, untuk keperluan produksi krupuk ikan sebanyak 1,5 kwintal sebesar Rp.3.895.540, dan untuk keperluan produksi krupuk ikan sebanyak 2 kwintal Rp.6.691.720 (3) Perputaran modal kerja UMKM krupuk ikan menunjukkan kurang efisien dan efektif.
ENGLISH:
Crackers village is one of the Micro, Small and Medium Enterprises (SMEs) as well as a tourist icon of Sidoarjo. The types of fish crackers produced in this crackers village are the superior products of this place. It has 7 workers from Tunggul Wulung village and five from Bioro village, Kedung Rejo, Jabon Subdistrict of Sidoarjo Regency .The purpose of this study to determine and explain the term of the bound period of working capital , projected cash requirement calculation on average per production , and working capital turnover .
This research belongs to the descriptive qualitative research The object of this research is the Micro, Small and Medium Enterprises (SMEs) of Kedung Rejo crackers in Jabon subdistrict of Sidoarjo regency while the subjects of the study is the fish crackers makers or workers. The data are taken from the range of the activities in the form of words and documentation with survey as its approach. The methodology of this research are observation, interview, and literature review.
The results showed that (1) The period needed for working capital dependent on SMEs fish crackers of Kedung Rejo village is 12 days to work. (2) The average cash needs per production of SMEs for fish cracker production in Kedung Rejo village as much as Rp.2.487.860 per quintal, while the necessity production of 1.5 quintal of fish crackers is Rp.3.895.540, and the necessity production of 2 quintal of fish crackers is Rp. 6.691.720. (3) The SME working capital turnover of fish crackers showed is less efficient and effective.
ARABIC:
كاروبوك هي قرية فيها عملية المجتمع علس حسب رأسمال من عميله وهذه القرية هي أيقونة السياحي فى سيدوارجو. من تحصيل العملية هي السلطة، تكون السلطة انتاج الجودة لقرية. الموظف لهذه العملية هي 7 اشخاص من قرية تولونج غوونج و 5 اشخاص من قرية بييورو، سيدوارجو. من هذ البحث، اهدافه هو تعرف وتبين عن عهد الوقت المتعلق برأسمال، خطة الحساب الإحتياج رأسمال فى كل العملية، و دور رأسمال.
منهج البحث هذ البحث هو منهج الكيفى الوصفى، بموضوع العملية المجتمع لقرية كروبوك، كيدغ ريجو، جانبون، سيدوارجو، والموظف فى العملية كفاعله. وجدت اباحثة البيانات من ميدان البحث بمقاربة على المرصاد، المقابلة و المكتبية.
اماتنائج البحث من البحث (1) عهد الوقت المتعلق برأسمال يحتاج الموظف لقرية كروبوك، كيدغ ريجو، جانبون، سيدوارجو هو 12 ايام. (2) خطة الحساب الإحتياج رأسمال فى كل العملية، لواحد القنطار يحتاج 2.487.860 روبية، و على 1,5 قتطار يحتاج 3.895.540 روبية و فى قنطاران يحتاج على 6.691.720 روبية. (3) لم مجد دور رأسمال فالعملية.
Item Type: | Thesis (Undergraduate) | ||||||
---|---|---|---|---|---|---|---|
Supervisor: | Yuliana, Indah | ||||||
Contributors: |
|
||||||
Keywords: | Jangka Waktu Periode Terikatnya Modal Kerja; Proyeksi Perhitungan Kebutuhan Kas Rata-Rata Per Hari; Perputaran Modal Kerja; Period of The Dependent; Projected Cash; Working Capital Turnover | ||||||
Departement: | Fakultas Ekonomi > Jurusan Manajemen | ||||||
Depositing User: | Perpustakaan Pusat | ||||||
Date Deposited: | 29 Jul 2016 12:55 | ||||||
Last Modified: | 29 Jul 2016 12:55 | ||||||
URI: | http://etheses.uin-malang.ac.id/id/eprint/3358 |
Downloads
Downloads per month over past year
Actions (login required)
View Item |